Company: Cadman Construction Ltd  |  Category: Education, Social, Community & Leisure

Case study project comprises a high specification, purpose built Music Centre and Auditorium comprising a medium sized 200 seater Performance/Recital Hall, circulation foyer and a number of designated Practice and Music Rooms to two floors within a separate teaching wing to the West of the building. 

This particular project required an exceptional level of attention to detail to ensure that strict acoustic performance criteria to specific room designs were achieved in conjunction with a natural passive cooling system operated by motorised vents to two high level chimneys which were designed to draw air from the building via a series of acoustically engineered, underground ventilation ducts.

Client

Greenwich Hospital/The Royal Hospital School

Architect

Buttress Fuller Alsop Williams

Surveyors

Bristow Johnson

Engineers

Cameron Taylor

Value

£3m

Procurement Route

Two Stage Tender

Latest Cadman Group News

New project awarded by Dfe at The Deanes School

We are proud to be the Main Contractor chosen by Dfe, The project consists of a two-storey 1,478m...

Read More

4th Floor Extension, South Wing, Colchester Institute

The 41,500 sq ft extension will provide additional classrooms, workshops, a library building and ...

Read More

Accreditations

BDMA
NHBC
Construction Line
Gas Safe
IICRC
FMB
Chas
NFB
Safe Contractor
Anglian Water
ACM
ISO 14001
Essex Wildlife Trust